The number of potentially critical points (about 150).The aspects listed below are potential issues in the traditional approach, which is suitable for short routes and/or simple studies: They also tested the vehicle swept path of an oversized vehicle with an unloaded trailer. They measured the topography and the most critical curves along the route. Local engineering professionals were called in to inspect the overall topography of the route to assess any challenges. Moreover, it has been possible to identify possible adjustments to the existing infrastructure in order to safely operate the oversized vehicles. The actual tests have been set aside because they would have affected the road traffic and delayed the project schedule. The objective of the path simulation along the provincial roads SP 3 and SP 107 was to verify the priori conditions of the existing infrastructure. Two routes in particular: Strade Proviciale (SP) 3 and 107, from Reggio Calabria harbour to the project sites presented challenges to the engineers.
The location of Piani di Lopa and Campi S.Antonio wind farm sites, which experts say are excellent for the wind and the rated power output, means engineers must study and plan the routes carefully prior to the transportation stage of the wind turbines components.ĭue to the conditions, use of specialized software simulating oversize vehicle paths is important for evaluating how the transportation of wind turbine components along the provincial roads might be achieved. They are mostly classified as "mountain roads", both for the geometric road characteristics and for horizontal curves of low radii. The Aspromonte region infrastructure network has a limited number of paved roads. In Reggio Calabria, the ENEL Green Power project proposed 2 wind farms development to be constructed in two areas: Piani di Lopa with 14 wind turbines rated output 0.85 MW and Campi S.Antonio with 25 wind turbines rated output 0.85 MW, within the boundaries of the three southern Italian municipalities of Bagaladi, Montebello Jonico, and Motta San Giovanni. With green technology like wind farms gaining popularity as generators of clean, efficient energy sources, technology and engineering are coming together to make these projects as safe and cost-effective as possible. Narrow mountain roads, steep hills and challenging ‘S’ curves are just part of the landscape in the ‘toe’ of Southern Italy, where wind farms are becoming a common part of the countryside. (Infrastructure division - Head Office Firenze) Use AutoTURN® to design infrastructure adjustments to safely operate trucks transporting wind turbine components.Įngineer Alessio Gori - collaborator at POLITECNICA INGEGNERIA ED ARCHITETTURA SOC. Transportation - Metrorail / Airways / Waterways.Technologies / Digitilization / Software.Crushing / Screening / Washing / M-Sand.Foundation / Piling Rigs / Drilling / Breakers.This option is described in the Readme.txt, which is part of the ATLite1023_70_English.zip.
Note: Optionally, you can update workstations to AutoTURN Lite 10.2.3 using the MSI installer, which is generated during the server installation. Repeat steps 1 – 9 on each workstation where AutoTURN Lite is to be installed.Follow the remaining onscreen prompts to complete the installation process.You will be presented with a screen to confirm the existing installation location.Browse to the AutoTURN Lite 10 Workstation Installers shared folder on the network server and run the file SetupWorkstation.exe.Browse to AutoTURN Lite 10 Workstation folder, right click on the SetupWorkstation.exe file, select Properties, and verify that the Modified Date is April 19, 2019.Select the Set up a Network License option and click on Install.Login to the server with an account that allows administrator permissions.